Kitchens, at the scale that suits the house
Most kitchens do not need gutting. If the carcasses are solid and the layout works, new doors, new counters and new hardware change the room for a fraction of a full remodel. If the layout is the problem, nothing cosmetic will fix it and you should spend the money properly. The first visit is about telling you which of those you are looking at.

What this covers
- Cabinet doors, drawer fronts, hinges and handles replaced on existing carcasses
- New cabinets, fitted and levelled
- Counters, splashbacks and tiling
- Sink and faucet cut-outs prepared for the plumbing contractor
- Flooring, trim, skirting and thresholds
- Painting, including cabinet spraying and refinishing
- Appliance openings adjusted so the new one actually fits
- Removal and disposal of the old kitchen
Roughly how long it takes
Ranges from work we have actually done, not a quote. Every house is different and the visit is where it gets pinned down.
Doors, drawer fronts and hardware replaced throughout
12 to 20 hours
Counters and splashback replaced, sink opening prepared
10 to 16 hours
Cabinets repainted and refinished
16 to 24 hours
Full strip-out and refit of a small kitchen
Several weeks, quoted as a project
A remodel is quoted as a project rather than drawn from membership hours. Where the membership earns its keep is the year after: the adjustments, the door that drops, the trim that shrinks, all the small corrections a new kitchen asks for.
What we hand to someone else
A trade that claims everything is telling you nothing. These are the parts of this work that are not ours, and who they go to.
- The plumbing connections are done by a licensed plumbing contractor, priced separately. We prepare the openings and the runs; they make the connections.
- New circuits, outlets and anything in the panel are done by a licensed electrical contractor, priced separately.
- Gas line work goes to the appropriately licensed trade.
- Moving a wall needs permits and sometimes an engineer. That is a conversation before the work, not during it.
What an hour costs
No membership
$150
an hour
Silver member
$135
an hour, after 2 included a month
Enterprise member
$112.50
an hour, after 12 included a month
Electrical and plumbing work is carried out by separately licensed contractors and priced separately. Washington requires an electrical contractor license to offer electrical work and a plumbing contractor license to bid or perform plumbing work, so we bring in the trade that holds one rather than quoting work we are not licensed to do.
